Vincent Thomas Bridge Closure

Closed for repairs until 2028

The bridge between San Pedro and Terminal Island closed at 12:01 a.m. on Saturday, Nov. 7, 2026 while Caltrans replaces the entire deck. Here is the countdown to reopening, how to get around it, and where to check traffic right now.

Countdown to reopening

The bridge reopens in

478Days
05Hours
04Minutes
48Seconds
Closed Sat, Nov 7, 20260.2% of the way thereTarget: Tuesday, February 29, 2028

Caltrans expects to reopen the bridge by February 29, 2028. Dates can shift with weather and construction, so check the links below for the latest.

See current detours on Caltrans QuickMap →

Live traffic and detours

Caltrans QuickMap shows the full closure, lane closures and current traffic speeds around the harbor. Check it before you head toward Terminal Island or Long Beach.

Open the Caltrans traffic map →

The detour route

Traffic is sent mainly along the Harbor (110) and Long Beach (710) freeways, State Route 103 and Harry Bridges Boulevard. Traffic officers are posted at 18 key intersections, and truck rules are enforced on local streets.

Detour map and project page →

What is being done

Crews are replacing the whole concrete deck, the center median, railings, fencing and signs, and adding new seismic sensors. The bridge itself is sound; the 60-year-old deck has worn out from heavy traffic and salt air. Total cost: $750 million.

Caltrans questions and answers →

Questions for Caltrans

Email the project team at vtbproject@dot.ca.gov. The Port of Los Angeles also posts updates for drivers and truckers; all port terminals stay open during the closure.

Port of Los Angeles updates →